With the basics of
- Analysis of existing systems
- Project plan
- Planning and optimisation of automated systems
- Value creation and wastage
- KANBAN
- SMED
- TPM
- Poka-Yoke
- FMEA
The detailed project task, with seven subsidiary tasks based on the example of the MPS Distribution, Inspection, Processing, Handling and Sorting stations, enables practical optimisation of a production process, with material flow analysis, devising and appraising suggestions for improvement, procurement and production of components, programming and commissioning the optimised system.
Implementation is illustrated for electronics engineers specialising in automation/operations engineering and for mechatronics engineers. It also includes links to the learning areas of the theoretical teaching in industrial mechanics. The training document supplements existing documentation on training with the Modular Production System.
M. Bellenberg, T. Mehwald, H. Regber, G. Schmidt, 2006 issue, 310 pages bound in folder, including CD-ROM with circuit diagrams, symbols and sample programs for the Siemens PLC S7-300.